| Brand Name: | WKS |
| MOQ: | 200/Piece |
| Price: | US $10.00 - 11.40/ Piece |
| Payment Terms: | T/T |
| Supply Ability: | 1000 piece in 10 days |
Ring Lock Scaffold is a heavy-duty modular system featuring rosette disc nodes welded to vertical standards. Designed for high-rise access, bridge falsework, and complex industrial structures, it offers superior load capacity and faster assembly than traditional tube-and-coupler scaffolding.
| Component | Vertical Standards |
|---|---|
| Materials | Q345/Q355B |
| Diameter | 60mm & 48mm |
| Pipe Wall Thickness | 3.0mm/3.2mm/3.25mm or customized |
| Surface Treatment | Powder Coated/Hot Dip Galvanizing |
| Weight | 1.8KG-18.75KG according to different sizes |
| Length | 200mm-3000mm various sizes available |
| Description | Main stressed part of ring-lock scaffold with inner fittings for height adjustment |
| Component | Adjustable Base Jack |
|---|---|
| Materials | Q235/Q345 |
| Pipe Type | Hollow or Solid |
| Screw Rod Diameter | 30mm-48mm or customized |
| Pipe Wall Thickness | 4mm/4.75mm or customized |
| Surface Treatment | Powder Coated/Hot Dip Galvanizing |
| Weight | 2.7KG-8KG according to different sizes |
| Adjustable Length | 100mm To 1000mm as required |
| Description | Arranged at the bottom of ring-lock scaffolding system |
| Component | U Head Jack |
|---|---|
| Materials | Q235/Q235B/Q345 |
| Pipe Type | Hollow or Solid |
| Screw Rod Diameter | 30mm-48mm or customized |
| Pipe Wall Thickness | 3.5mm-4.75mm or customized |
| Surface Treatment | Powder Coated/Hot Dip Galvanizing |
| Weight | 2.91KG-8KG according to different sizes |
| Adjustable Length | 100mm To 1000mm as required |
| Description | Used to support keel and adjust scaffold height |
| Component | Truss (Bridge) Ledger |
|---|---|
| Materials | Q235/Q355 |
| Diameter | 48.3mm |
| Pipe Wall Thickness | 3.25mm |
| Surface Treatment | Powder Coated/Hot Dip Galvanizing |
| Weight | 9.35KG-19KG according to different sizes |
| Length | 1.52m-3.05m or customized |
| Description | Enhances scaffolding stability |
| Component | Lattice Beam (Girder) |
|---|---|
| Materials | Q235/Q355 |
| Diameter | 48.3mm |
| Pipe Wall Thickness | 3.0mm-4.0mm |
| Surface Treatment | Powder Coated/Hot Dip Galvanizing |
| Weight | 25KG-150KG according to different sizes |
| Length | 2070mm-6140mm or customized |
| Description | Enhances scaffolding stability |
| Component | Side Bracket |
|---|---|
| Materials | Q355 |
| Diameter | 48.3mm |
| Pipe Wall Thickness | 3.2mm/3.25mm or customized |
| Surface Treatment | Powder Coated/Hot Dip Galvanizing |
| Length | 360mm-1090mm or customized |
| Description | Used when main frame cannot reach required positions |
| Component | Steel Plank |
|---|---|
| Materials | Q235 |
| Diameter | 48.3mm |
| Thickness | 1.2mm-2.0mm or customized |
| Surface Treatment | Powder Coated/Hot Dip Galvanizing |
| Size | Various standard and custom sizes available |
| Description | Facilitates safe worker movement during construction |
Widely used in bridge engineering including general elevated bridges, tunnel engineering, factory buildings, elevated water towers, power plants, refineries, and special factory building support design. Also suitable for pedestrian overpasses, span sheds, storage shelves, chimneys, water towers, indoor and outdoor decoration, large-scale concert stages, background frames, stands, viewing platforms, styling frames, staircase systems, stage construction, sports competition stands, and various other projects.
We are a subsidiary foreign trade company of a group company, responsible for exporting formwork and scaffolding products. Our group company operates two major production bases with over 20 years of specialized production experience.
We provide professional implementation solutions, high-quality products, and efficient technical support services in the field of templates and scaffolding.
Yes, we can provide samples. Customers are responsible for shipping costs.
Provide specific requirements list, or inform us of your intended product use - we will develop a customized plan based on your needs.
Specific quotations typically completed within 2 days. Delivery time after contract signing usually 10-30 days depending on project complexity.
T/T 30% deposit before manufacture, 70% balance against B/L Copy, or L/C.