details van de producten

Created with Pixso. Huis Created with Pixso. Producten Created with Pixso.
Buis- en klemsteiger
Created with Pixso.

Heavy Duty Tube And Clamp Scaffold for Industrial Construction and Maintenance

Heavy Duty Tube And Clamp Scaffold for Industrial Construction and Maintenance

Merknaam: WKS
MOQ: 200/ ingesteld
Prijs: US $1.00 - 2.00/ Set
Betalingsvoorwaarden: T/T
Leveringscapaciteit: 1000 stuks in 10 dagen
Gedetailleerde informatie
Plaats van herkomst:
Hebei, China
Certificering:
ROHS
Productnaam:
Buis- en klemsteiger
Materiaal:
staal
Ontwerpstijl:
Industrieel
Voordeel:
Stabiel
Kleur:
Verzoek van de klant
Maat:
3,56 kg/m -4,37 kg/m
Verpakking:
37 of 61 stuks/bundel.
trefwoord:
snelle klembuisfittingen
Gebruik:
Bouwconstructie
Oppervlaktebehandeling:
Thermisch verzinkt of PVC gecoat
Verpakking Details:
Gebundeld / Ingebonden bundels/Optimalisatie van containerbelading
Productomschrijving
Heavy Duty Tube And Clamp Scaffold for Industrial Construction and Maintenance
Product Overview

The Cuplock Scaffolding System is a modular steel scaffold using a cup-and-blade connection - hammer down the upper cup to lock ledgers in seconds. Made from Q355B steel with hot-dip galvanized finish (≥55μm), it offers up to 120 kN load per standard and EN 12810 compliance.

Compared to frame or tube-clamp systems, Cuplock provides faster erection, higher strength, and 20+ years corrosion resistance - ideal for general construction and formwork falsework.

Why Choose Cuplock Scaffolding?
  • Fast Connection - Secure joints in under 5 seconds with a hammer
  • 120 kN Load Capacity - Handles heavy concrete formwork and bridges
  • Hot-Dip Galvanized - No rust, no painting, 20+ year service life
  • 90° Fixed Angles - Perfect for rectangular building perimeters
  • EN 12810 Certified - Accepted on international projects
Key Applications
  • Building facade access
  • Slab & beam formwork falsework
  • Bridge pier support
  • Industrial maintenance access
Technical Specifications
Parameter Value
Material Q355B Steel
Pipe Size 48.3mm × 3.2mm
Cup Spacing 1.0m
Finish Hot-dip galvanized (≥55μm)
Max Leg Load Up to 120 kN
Standards EN 12810, EN 12811
System Components
  • Vertical standards (1.0-3.0m)
  • Horizontal ledgers (0.6-2.4m)
  • Diagonal braces / Base jacks / Top jacks
Load Capacity (SWL per standard)
Spacing Height ≤5m
1.2×1.2m 120 kN
1.5×1.5m 80 kN
1.8×1.8m 50 kN
Cuplock vs. Ring Lock
Aspect Cuplock Ring Lock
Connection Cup + blade Rosette + wedge
Angle 90° only 45° increments
Max Load 120 kN 150 kN
Cost Moderate Higher
Cuplock Scaffolding System product image Send Inquiry